Carlisle College, Carlisle

it was an interior fit out consisting of door sets, skirting boards, cill boards, architrave and ironmongery. there was various extra works such as pipe boxings door linings and plaster boarding and bulk head works, break throughs from old building to new building, access panels, and temporary hoardings and ramps.

we were also involved in a lot of remedial works to the origional college which was joined by a bridge which we fitted a non slip floor too. the remedial works consisted of large window linings, works to stairwells which involved modernising old and dated features, masking panels to new windows, upgrade works to kitchen area and new cills throughout. 

this job was on a tight time scale as students were starting their new term of college and the building had to be fully operational.